Solid-fuel stove installation questions answered
Costs, 316L versus 904L flue liners, twin-wall chimneys, Irish Part J rules, boiler plumbing and VAT in one reference.
Free, no obligation. One local installer prices it, not five.
- €2,200–€4,200room stove fitted with liner
- €900–€1,800fit-only into sound clay flue
- 5 kWPart J external vent threshold
- 75–82%EcoDesign closed-stove efficiency
Price my stove
Four quick taps show your Irish stove installation figure before we ask for a phone number. One installer rings you, not five.
A freestanding stove, with flexible chimney lining, supplied and fitted: €2,200 to €4,200, typical Irish fitted range.
How this stove figure is worked out
The range reflects typical Irish rates for that appliance type, flue route and scope. Room-heater figures cover an EcoDesign 2022 stove, register plate, vitreous connecting pipe, bird cowl, smoke test and I.S. EN 50291-1 CO alarm. Selecting chimney relining allows for an 8 m to 10 m 904L flexible stainless liner. Boiler stoves allow for open-vented copper primaries and a heat-leak radiator. Tall 3-storey roof scaffolding, core-drilling air vents and marble surrounds depend on the house and are confirmed during the chimney survey.
Every stove fitting question answered
How much does stove installation cost in Ireland?
Supplying and fitting a 5 to 8 kW freestanding or inset wood-burning stove with a 904L flexible chimney flue liner costs €2,200 to €4,200 in Ireland. Fit-only stove installation (you buy the stove) runs €900 to €1,800 into a sound clay flue or €1,500 to €2,600 with a new liner. Plumbed boiler stoves cost €3,600 to €6,200 fitted, and twin-wall insulated flue systems for houses with no chimney run €1,800 to €3,400 for the flue alone.
How much does fit-only stove installation cost?
Allow €900 to €1,800 into a sound existing clay flue, €1,500 to €2,600 when adding a 904L stainless flexible liner, and €2,400 to €3,900 for fitting and plumbing a customer-supplied boiler stove.
What is the difference between a 316L and 904L flue liner?
A 316L stainless flexible liner (€950 to €1,550 fitted) suits dry seasoned wood logs only. For Irish smokeless coal, briquettes or peat, specify 904L grade (€1,100 to €1,950 fitted), which resists sulphuric acid condensate and carries far longer liner life, paired with vermiculite backfill (€250 to €500) on cold outside gables.
Do I need vermiculite insulation around a flexible flue liner?
Backfilling with loose vermiculite (€250 to €500) keeps flue gases hot on exposed external gable chimneys, reduces sticky creosote buildup and improves lighting draw in cold weather.
Can you install a wood-burning stove without a chimney?
Yes, using a factory-made insulated twin-wall stainless flue routed through an external wall or straight up through ceilings and the pitched roof. Flue supply-and-fit runs €1,800 to €3,400, or €3,400 to €5,400 with an EcoDesign stove.
What are the Irish Part J air vent and CO alarm rules?
Under Irish Building Regulations Technical Guidance Document J, every new or replacement stove requires an I.S. EN 50291-1 carbon monoxide alarm in the stove room, within 5 m of every bedroom door and along the flue path. Stoves over 5 kW need a permanent non-closeable external air vent (550 mm² per kW above 5 kW), and modern airtight homes (air permeability at or below 5 m³/h·m²) need dedicated external air even for 5 kW models.
How many kW stove do I need for my living room?
Measure length × width × height in metres and divide by 14 for a typical Irish semi-detached home (divide by 18 for a modern A/B-rated home, or 11 for an uninsulated stone cottage). Most standard Irish front rooms suit a 4.5 to 5 kW stove.
How thick and deep must a stove hearth be under Irish rules?
A solid non-combustible constructional hearth must be at least 125 mm thick. If the stove is manufacturer-tested to keep hearth surface temperature below 100°C, a 12 mm superimposed slate or glass hearth may be used. Allow 225 mm to 300 mm in front of the stove door and 150 mm to each side.
Can a boiler stove connect to my existing oil or gas boiler?
Yes, via an open-vented gravity primary circuit with 28 mm copper pipework, an unvalved heat-leak radiator and a dual-fuel neutraliser or systemlink manifold (€650 to €1,400 extra). Boiler stoves must NEVER be connected directly into a sealed pressurised system without approved safety controls.
What firewood moisture limit applies in Ireland?
Under S.I. No. 529 of 2022 as amended by S.I. No. 389 of 2025, wood logs sold in loads under 2 m³ must contain less than 20% moisture (tightened from 25%). Burning wet timber drops heat output and coats flues with flammable tar.
How often should a stove chimney liner be swept?
Sweep at least once a year before autumn if burning seasoned wood, and twice a year if burning smokeless coal or lighting the stove daily all winter (€75 to €130 per sweep). Always use nylon or polypropylene brushes inside stainless steel liners, never harsh steel scrapers.
How long does a stove installation take?
Fitting a room heater into a sound flue takes 1 day. Adding a flexible liner takes 1 to 2 days. Twin-wall flue systems and plumbed boiler stoves take 2 to 3 days on site.
What VAT rate applies to stove fitting in Ireland?
Buying a stove supply-only carries 23% VAT. Permanently fitted supply-and-fit stove contracts qualify for 13.5% VAT under Revenue's two-thirds rule only when the net goods cost does not exceed two-thirds of the VAT-exclusive total; above two-thirds, the full invoice moves to 23%.
Who contacts me after I complete the stove planner?
Your stove outline goes straight to a single stove installer in your county, and nobody else. They ring to inspect the chimney, hearth and room size and send a written quote.
Every stove installation page and Part J guide
Stoves & flue systems
Part J, sizing & specs

Check your stove fitting figure before booking a chimney survey
Choose the appliance, flue route and scope. When you are ready for a written survey price, your request goes to a single stove installer in your county.
